Call us for producing free electricity from roof of your factory;
ofis tel: 0224 443 42 62 , 0532 205 06 97 e-mail: info@hanaenerji.com.tr
|
Our company is the last ring of project assisted engineering solutions which have been done since year 2002. In projects which are done by our group companies, an energy saving ratio of %4...35 was guaranteed with companies (the leaders of mechanical utilities sector in Turkey) which we walk with. The group's companies have made a big move to situation of a professional project management. Our services to Turkish Industry will continue and rise without any concession in quality. |
PRODUCING ELECTRIC FROM ROOF OF YOUR FACTORY
By placing photovoltaic solar panels on the roof of your factory,
we are able to produce all your internal consumption with solar
energy in order not to exceed the electricity contract power.
According to the new regulation issued in May 2019, "monthly set-off"
has started for the GES (solar power system) to be installed
on the roof. Thus, no battery-like electrical storage unit is needed.
All electricity generated from the sun is deducted from your direct consumption bill.
PRODUCING ELECTRIC FROM ROOF OF YOUR FACTORY
Due to the monthly set-off feature and rising
electricity prices, unlicensed solar power plant to be installed on the roof of the
factory even in OIZ as of July 2019, with the savings it provides, can make ALL KEY
DELIVERY INVESTMENT COSTS AMORTHED FOR MORE THAN 4 YEARS.
"Preliminary feasibility, final discovery and final offer, order delivery and
application of panels to the roof, internal electrical infrastructure and the management
of the ongoing bureaucratic process throughout all these works" can last from 5 to 7 months.
EPC CONTRACTED NATURAL GAS ENGINE COGENERATION SYSTEMS
We build high-efficiency cogeneration plants
on a turn-key basis using natural gas engines to burn gas to your factory and produce steam + hot water.
100% from feasibility & quotation stage to supply & installation of engine / flue + waste heat boiler +
control board and scada + HT & LT circuit elements, application of internal
electrical infrastructure, adaptation of steam and hot water to be obtained to your business,
revision of transformer and internal compensation panel.
Please contact us if you would like to receive an all-inclusive cogeneration system offer.
EPC CONTRACTED NATURAL GAS ENGINE COGENERATION SYSTEMS
When using Botaş's current COMPOSITE tariff for July 2019 for the natural
gas to be consumed by the engine, using the average electricity cost in
the OIZ and using the steam & hot water costs of a steam boiler with 90%
efficiency, the whole system can be amortized for 2 years.
note: The above-mentioned depreciation figure includes 100% non-gas operating costs. These expenses;
* 1 year average cost of all 5-year standard maintenance requirements
** Annual engine oil consumption
BOILER HOUSE INSTALLING
Full steam boiler house installing Deciding necessities of structure of boiler house building High efficiency burner selection for boiler and deciding fuel jobs Design and istalling for degasser and feed water tank, P&ID of boiler house 72 hours of unattended boiler house designing acc.to TRD604 Planning,selection and installation of necessary pumps
CHILLER SYSTEMS
Design of chiller systems, machine selection and installation Pump selection and design for chiller systems, also valves and necessary electronic equipments for chillers Design, selection and installation of water cooling towers.
TURNKEY EPC ENERGY RECOVERY SYSTEMS
Flue Gas Economizer & Recuperator
Textile WASTE WATER Energy recovery system
Compressed air compressor heat recovery,
Automotive Paintshop furnace heat recovery,
Textile Ram Ramöz chimney heat recovery,
Ram machine chimney filter,
Electricity generation from waste heat with ORC (Organic rankine cycle)
SPECIAL DESIGN PACKAGEDHEAT EXCHANGER STATIONS
Steam Pack Hot Water Stations
Pressure reducing stations on package type chassis
Package type chassis on counter station
Hygienic package systems on stainless chassis for food
Monitoring station measuring package type on chassis
Sampling station on package type chassis
COMPLETE FACTORY
MECHANICAL INSTALLATION
All installation & console works between your auxiliary plants and machine park;
Steam & condensate installations,
Soft & Hard Water, Hot-cold Water, RO water installations, Water tanks intermediate installations,
Compressed air installations,
Fire installations,
Process & Food Stainless Installations
And all installation insulation insulation works.
COMPLETE FACTORY TRANSPORTATION
(DONATION & ASSEMBLY) WORKS
Textile factory complete disassembly and assembly service;
Ram machines, washing machines, fixing machines and jets are marked with zero error, disassembled and reassembled.
Boiler room, compressors, paint kitchen, booster & softening systems disassembly and assembly.
Dismantling and assembly of panels and electronic components
Complete commissioning of the plant at the new site.
SPECIAL REVISION WORKS FOR TEXTILE MACHINERY
RAM machine mechanical maintenance works,
RAM machine burner maintenance works,
RAM machine panel modification works,
Complete new panel manufacturing and application for RAM machine,
Production and application of complete new panel for Contini washing machines,
Revision on panel for jet washing,
New panel manufacturing and application for jet washing.
FACTORY ENERGY MONITORING REGISTRATION SYSTEM
We are setting up an industrial energy monitoring automation system that can be
fully modified for your factory and can include all of your current pulse & contact or analog output meters.
All missing counters, analyzers and so on. also for device plus assembly service and
With all necessary cable communication infrastructure, we are able to set up your turnkey
energy monitoring system under economic conditions.
Our system is able to send all e-mails to the related persons regularly.
FACTORY DETAILED ENERGY STUDY
AND REPORTING
Flow, power, speed, temperature, humidity,
light and sound measurements and energy performance map of the whole business
Local and detailed energy study applications
Walk through and Pre-energy studies
VAP consultancy and implementation
Domestic and international energy efficiency incentive projects applications
WHY IS HANA ENERGY PREFERRED IN INDUSTRIAL ENERGY STUDIES?
BECAUSE;
Hana Energy is able to apply every project written in its study
report and prove to the factory the calculated energy savings.
Expert teams collect the necessary data in the field in a short time and complete the necessary measurements quickly. In this way, data is collected without interfering with the normal operation of the enterprise. Thanks to their measurement experience, they give confidence to operating authorities in terms of occupational safety, even in critical locations.
WHY IS HANA ENERGY PREFERRED IN INDUSTRIAL ENERGY STUDIES?
BECAUSE;
As a process-based experience, Hana Energy makes point shootings in energy studies with its knowledge of more than 25 years in many industries such as TEXTILE, CHIPBOARD & MDF, MILK, STEEL.
After the energy survey work is completed and the report is presented to the company, Hana Energy puts its hand under the stone wherever necessary. Projects to be made; contractor or controller.
FACTORY DETAILED ENERGY STUDY WORK STEPS
Pre-inspection of the enterprise Submit your energy study proposal. Energy survey order stage Making business plan and receiving data to be collected remotely Field work. Basic examination and determination of measurement points. Detailed available data analysis. Performing measurements and inspections (may take from 3 days to 1 month) Reporting and reporting next presentation
INDUSTRIAL ENERGY AUDITSINFRARED MEASURINGS
INDUSTRIAL ENERGY AUDITSULTRASONIC AIR LEAKAGE SCANNING
INDUSTRIAL ENERGY AUDITSINSPECTION FOR COOLING SYSTEMS
INDUSTRIAL ENERGY AUDITSINSPECTION FOR PUMPS AND HYDROPHORES SYSTEMS
INDUSTRIAL ENERGY AUDITSBIG SYSTEMS exc:POWER PLANTS
INDUSTRIAL ENERGY AUDITSMEASURINGS FOR ELECTRICITY
INDUSTRIAL ENERGY AUDITSINSPECTION FOR BOILER HOUSE OF STEAM
INDUSTRIAL ENERGY AUDITSMEASURINGS FOR TRANSFORMERS
UNLICENSED ELECTRICITY GENERATION REGULATION IN ELECTRICITY MARKET
The purpose of this Regulation is to ensure that consumers
needs from its own production facility closest to the consumption point
small-scale production to ensure supply security.
facilities to the national economy and small-scale production
efficient use of electricity resources
licensing and reducing the amount of losses incurred.
generate electricity without obligation to establish a company,
to determine the principles and procedures to be applied to natural or legal persons.
Although solar plants seem to be easy to install and operate, the truth is not.
If solar power plants are not built properly and not followed well, you will suffer thousands of pounds per month. Even in the coming years, even serious malfunctions may occur.
There are so many things that are overlooked and made wrong in solar power plants that, unfortunately, many solar power plants cannot produce the desired energy or continuous failure can occur.
In this study, high energy performance net zero energy buildings (nZEB) and approximate zero energy buildings (nnZEB) what is, how to evaluate should be emphasized. Although much talked about, it's clear zero energy building (nZEB) and approximate zero energy building (nnZEB) concept it is not fully defined and stuffed. Even so In the near future, a real cost of around 10 percent nZEB will be able to build buildings (10 percent additional investment here renewable energy production in the building).
Connecting multiple solar cells in series or parallel
The material obtained with is called. Solar cell alone enough
the amount of energy. Therefore, solar cells
output power of the system can be increased by connecting. Solar panels 3 watts
Available in powers ranging from 300 watts.
The solar panel generates electricity from solar energy. Today
the rapid development and use of solar panel technology
solar panel prices are also quite favorable.
levels.
|
Saturated Steam Table |
Safe Steam Boiler |
Psychometric chart |
|
Variables for saturated steam |
72 hours unattended steam boiler |
Wet Thermometer & Dry Thermometer |
|
Thermodynamic properties of air |
Thermic degasser for steam |
Ton Equivalent Oil Conversion Table |
|
Density of air at different temperatures |
Density of air at different temperatures Specific heat capacity |
Ton Equivalent Oil Unit (TEP) Conversion |
SOME OF OUR REFERENCES (BY HANA & BTM GROUP)
Contact Info;
ÜÇEVLER MH. NİLÜFER TİCARET MERKEZİ
69. SK. NO:6 K:2 NİLÜFER/BURSA/TÜRKİYE
+90 224 443 42 62
+90 224 443 42 61
info@hanaenerji.com.tr