Please contact us to get an efficient water softening system in your factory.;
tel: 0224 443 42 62
e-mail: info@hanaenerji.com.tr
Our company is the latest member of the vision of project-based engineering applications that extends from 2002 to the present. Energy savings of 4...35% have been achieved in industrial facilities through energy efficiency projects implemented in our group companies. In addition to energy, WATER SAVING PROJECTS IN INDUSTRY have also been included in our portfolio since 2021. Our services to our country's industry will continue to increase without compromising on quality. |
ISIKSOY TEXTILE / Bursa
EZGI TEXTILE / Bursa
SOLKA TEXTILE / Bursa
BARUTCU TEXTILE / Bursa
Our efficient softening systems feature fully automatic self-management that continuously measures and controls the outlet water hardness.
ELYAF TEXTILE / Bursa
Online water hardness control system
Fully automatic controlled softening system (100% automatic, unmanned control)
Accurate hardness measurement using the correct laboratory method is the starting point for water management. We provide free laboratory measurement method support to all facilities where we install softening systems.
'TURNKEY' EFFICIENT WATER SOFTENING SYSTEMS
With Koralay Makina's new generation
of high-efficiency water softening systems, we can reduce the salt consumed by the
softener by half (or even more). We can also reduce the water consumed (lost) by the
softener during its regeneration process by at least 50% (we have a reference
showing 85% water savings).
EXAMPLE: An avarage factory uses 325,000m3 of raw water
(25Fr hard water) to produce 286,000m3 of soft water annually, resulting in a water
loss of 39,000m3 annually. Switching to our efficient softening system will reduce
the water loss by 2%, or 5,800m3. The water savings will be proportional to 85%,
amounting to 33,200m3/year.
'TURNKEY' NATURAL GAS ENGINE COGENERATION SYSTEMS
Using Botaş's current COMPOSITE tariff for
December 2020 for the natural gas consumed by the engine, taking into account the average
electricity cost within the Organized Industrial Zone, and using the steam and hot water
costs of a factory with a 90% efficient steam boiler, the entire system can amortize its
investment within two years.
As of December 2020, cogeneration projects have been included in the VAP incentive project.
Note: The above depreciation calculation includes 100% of the engine's non-gas operating
expenses. These expenses include:
* Average cost of all standard maintenance requirements
for 5 years, calculated over 1 year
** Annual engine oil consumption cost
'TURNKEY' SOLAR ENERGY WITH ROOFTOP ELECTRICITY GENERATION
By placing photovoltaic solar panels on the roof of your factory, we can generate all your internal consumption with solar energy, not exceeding the electricity contract power. According to the new regulation issued in May 2019, monthly offsetting was introduced for rooftop solar power systems. This eliminates the need for a battery-like electrical storage unit. All electricity produced from the sun is deducted from your direct consumption bill.
'TURNKEY' SOLAR ENERGY WITH ROOFTOP ELECTRICITY GENERATION
Due to the introduction of the monthly offset feature and increasing electricity prices, the unlicensed solar power plant to be installed on the factory roof even within the OIZ as of December 2020 can AMORTIZE THE ENTIRE TURNKEY INVESTMENT COST IN LESS THAN 5 YEARS with the savings it provides. "Pre-feasibility, final survey and final offer, order delivery and application of panels to the roof, internal electrical infrastructure and management of the bureaucratic process that continues throughout all these works" can take 5...7 months from beginning to end.
'TURNKEY' STEAM BOILER HOUSE
Complete installation of Steam, Hot Water and Hot Oil Boiler Room Determination of boiler room building room requirements, Selection of high-efficiency burners suitable for the boiler and capacity and gas works, Design and installation of deaerator tank and condensate tank, Steam boiler project, layout and installation, Planning of 72-hour unattended safety accessories in TRD604 norm, Selection and installation of all necessary pumps and hydrophores.
'TURNKEY'CHILLERS AND TOWER COOLING SYSTEMS
Chiller system design, device selection, and installation Cooling system pump design, selection, and installation Water cooling tower selection and installation Turnkey applications with heat pumps for air-to-air, air-to-water, water-to-water.
'TURNKEY'ENERGY RECOVERY SYSTEMS
Flue gas Economizer & Recuperator Textile WASTEWATER Energy Recovery System Compressed Air Compressor Heat Recovery, Automotive Paint Shop Oven Heat Recovery, Textile Stenter Stenter 'ram' Chimney Heat Recovery, Stenter 'ram'Machine Chimney Filter, ORC (Organic Rankine Cycle) Electricity Generation from Waste Heat
SPECIAL DESIGN ON THE CHASSISPACKAGED HEAT EXCHANGER SYSTEMS
Steam package hot water stations Pressure reducing stations on packaged chassis Metering stations on packaged chassis Hygienic packaged systems on stainless chassis for food Measurement and monitoring stations on packaged chassis Sampling stations on packaged chassis
COMPLETE FACTORY MECHANICAL INSTALLATIONS
All installations and console work between your auxiliary facilities and your machinery; Steam & condensate installations, Soft & Hard Water, Hot & Cold Water, RO Water installations, Water tank interconnection installations, Compressed air installations, Fire systems,WASTE WATER INFRASTRUCTURE SYSTEMS Process & Food stainless steel installations, And all installation insulation and insulation works.
COMPLETE FACTORY MOVES (DISASSEMBLY & ASSEMBLY)
Complete textile factory disassembly and assembly service; Stencil machines, washing machines, setting machines, and jets are marked, disassembled, and reassembled with zero error. Boiler room, compressors, dye kitchen, hydrophore, and softening systems disassembly and assembly. Disassembly and assembly of panels and electronic components. Complete commissioning of the facility at its new location.
SPECIAL OVERHAUL WORKS FOR TEXTILE STenter MACHINES
Stenter machine mechanical maintenance, Stenter machine burner maintenance, Stenter machine panel modification, Complete new panel manufacturing and implementation for the stenter machine, Complete new panel manufacturing and implementation for Continine washing machines, Panel overhaul for jet washing, New panel manufacturing and implementation for jet washing.
FACTORY DATA & ENERGY MONITORING AND RECORDING SYSTEM
We install industrial energy monitoring automation systems that can integrate all your existing pulse, contact, or analog output meters and can be customized specifically for your factory. We also provide equipment and installation services for any missing meters, analyzers, etc. We can install your turnkey energy monitoring system at affordable prices, including all necessary cable communication infrastructure. Our system automatically emails all requested reports to the relevant parties on a regular basis.
DETAILED FACTORY ENERGY AUDIT AND REPORTING
Determining the energy performance map of the entire facility through flow, power, speed, temperature, humidity, light, and sound measurements Local and Detailed Energy Audit Applications Walk-through and Preliminary Energy Audits VAP (Efficiency Improvement Project) Consultancy and Implementation Domestic and International Energy Efficiency Incentive Project Applications
WHY IS HANA ENERGY PREFERRED FOR INDUSTRIAL ENERGY AUDIT?
BECAUSE; Hana Energy can implement every project outlined in its audit report and prove the calculated energy savings to the factory. Its expert teams quickly collect the necessary data on-site and complete the necessary measurements. This way, data is collected without disrupting the normal operation of the business. Thanks to its measurement experience, it instills confidence in business officials regarding occupational safety, even in critical locations.
WHY IS HANA ENERGY PREFERRED FOR INDUSTRIAL ENERGY AUDIT?
BECAUSE; Hana Energy, with over 25 years of process-based experience in numerous industries, including TEXTILES, CHIPBOARD & MDF, MILK, and STEEL, conducts precise energy audits. Once the energy audit is completed and the report is submitted to the company, Hana Energy takes on any necessary responsibility. It can be a contractor or a controller for projects.
DETAILED FACTORY ENERGY AUDIT WORK STEPS
Preliminary inspection of the facility Submission of your energy audit proposal. Ordering an energy audit phase Developing a work plan and collecting remote data Field work. Determining basic inspection and measurement points. Detailed analysis of existing data. Conducting measurements and conducting inspections (may take from 3 days to 1 month) Reporting and post-report presentation
INDUSTRIAL ENERGY AUDITSINFRARED MEASUREMENTS
INDUSTRIAL ENERGY AUDITSULTRASONIC AIR LEAK SCAN
INDUSTRIAL ENERGY AUDITSCOOLING SYSTEMS INVESTIGATIONS
INDUSTRIAL ENERGY AUDITSPUMP & HYDROPHORE SYSTEM INSPECTIONS
INDUSTRIAL ENERGY AUDITSLARGE SYSTEMS
INDUSTRIAL ENERGY AUDITSELECTRICAL ENERGY MEASUREMENTS
INDUSTRIAL ENERGY AUDITSSTEAM BOILER HOUSE INVESTIGATIONS
INDUSTRIAL ENERGY AUDITSELECTRICAL ENERGY MEASUREMENTS
REGULATION ON UNLICENSED ELECTRICITY GENERATION IN THE ELECTRICITY MARKET The purpose of this Regulation is to determine the procedures and principles applicable to real or legal persons who can generate electricity without the obligation to obtain a license or establish a company, in order to ensure that consumers meet their electricity needs from their own production facility closest to the point of consumption, to ensure supply security, to contribute small-scale production facilities to the national economy, to ensure the efficient use of small-scale production resources, and to reduce losses in the electricity grid.
While solar power plants may seem easy to install and operate,
the reality is that they are not. If solar power plants are not
properly constructed and monitored, you could lose thousands of
lira per month. Even serious malfunctions can occur in the coming years.
There are so many things that are overlooked and done incorrectly in solar power plants that, unfortunately, many solar power plants fail to produce the desired energy or experience constant malfunctions due to these errors..
IBC Solar Turkey will continue its product supply and turnkey EPC solutions operations under the name IBT Solar as of this year. Since 2014, IBC Solar Turkey has redefined its partnership with the German product supply and EPC company IBC Solar AG with a different business model. In line with its growing market potential, IBC Solar Turkey has decided to continue its operations under the name IBT SOLAR. Source: IBC Solar Turkey has changed its name. As the "Preferred Premium Partner" of our parent company, IBC Solar AG, IBT Solar will serve the Turkish and Middle Eastern markets with turnkey engineering, procurement and construction (EPC) solutions, consulting, project design, and product sales. Source: IBC Solar Turkey has changed its name.
The government announced that they have expanded the scope of existing supports, such as VAT exemptions and customs duty exemptions for wind and solar energy investments, paving the way for investments in unlicensed activities generating electricity from solar and wind energy to benefit from fourth-region supports.
This will provide solar and wind energy investors with a VAT exemption, a 30% tax reduction in addition to customs duties, and support for employer contributions to insurance premiums for six years.
"Incentives will support companies of all sizes."
Saturated Steam Table |
Safe Steam Boiler |
Psychrometric Chart |
For saturated steam Enthalpy, pressure, temperature |
72-hour unattended steam boiler Boiler safety equipment in accordance with TRD 604 standard |
Wet bulb & Dry bulb Humidity and temperature for air |
Thermodynamic Properties of Air |
Thermal Deaerator for Steam |
Ton Equivalent Petroleum Conversion Table |
Density of air at different temperatures Specific heat capacity |
Thermal Degasser for steam systems Internal structure and flow diagram |
Ton of Petroleum Equivalent Unit (TEP) Conversion coefficient table for other energy types |
SOME OF HANA ENERJİ and BTM GROUP REFERENCES
ADRESS;
ÜÇEVLER MH. NİLÜFER TİCARET MERKEZİ
69. SK. NO:6 K:2 NİLÜFER/BURSA/TÜRKİYE
+90 224 443 42 62
+90 532 205 06 97
+90 224 443 42 61
info@hanaenerji.com.tr